Friday 12 July 2019 9.00am EDT
During the last week the observing schedule was replanned to incorporate an observation of 4U 1901+03, which was accepted as a Director's Discretionary Time Target of Opportunity on Jul 9. Loads for the replanned schedule were uplinked on Jul 11. A scheduled observation of MRC2035-203 was impacted by the replan and will be will be rescheduled in a future week. Real-time procedures were executed on Jul 9 and 11 to perform full-frame dark current readouts of the Aspect Camera Assembly CCD. Of note this week was the announcement on Jul 11 of the Cycle 21 Peer Review recommended programs. For details see: http://cxc.harvard.edu/target_lists/cycle21/index.html The schedule of targets for the next week is shown below and includes an observation of Sgr A* coordinated with Spitzer. |
------------------------------------------
Radiation Belts Jul 14 zetaPup ACIS-S/HETG RXJ1856.5-3754 HRC-S /LETG Jul 15 Jupiter HRC-I Abell2146 ACIS-I Jupiter HRC-I Jul 16 zetaPup ACIS-S/HETG Radiation Belts Jul 17 zetaPup ACIS-S/HETG SgrA* ACIS-S RXJ1856.5-3754 HRC-S /LETG Jul 18 Jupiter HRC-I CHIPS1911+4455 ACIS-I Jul 19 LQPeg ACIS-S Radiation Belts Jul 20 zetaPup ACIS-S/HETG RXJ1856.5-3754 HRC-S /LETG SgrA* ACIS-S RXJ1856.5-3754 HRC-S /LETG Jul 21 zetaPup ACIS-S/HETG Radiation Belts Jul 22
------------------------------------------
All spacecraft subsystems continued to support nominal operations.
Return to Status Reports