CXC Home | Search | Help | Image Use Policy | Latest Images | Privacy | Accessibility | Glossary | Q&A
Friday 29 March 2019 9.00am EST
During the last week Chandra completed the observing schedule as planned. Real-time procedures were executed on Mar 22, 25 and 28 to perform full-frame dark current readouts of the Aspect Camera Assembly CCD. The schedule of targets for the next week is shown below. |
------------------------------------------
RMJ135424.7-010247.8 ACIS-I Apr 1 B2.22104+24 ACIS-S A1795 ACIS-I Radiation Belts Apr 2 A1795 ACIS-S CIZAJ2242.8+5301 ACIS-I Apr 3 HZ43 HRC-S HZ43 HRC-S HZ43 HRC-S HZ43 HRC-S HZ43 HRC-S HZ43 HRC-S HZ43 HRC-S HZ43 HRC-S HZ43 HRC-S HZ43 HRC-S HZ43 HRC-S HZ43 HRC-S HZ43 HRC-S HZ43 HRC-S HZ43 HRC-S HZ43 HRC-S CIZAJ2242.8+5301 ACIS-I MRC0421-225 ACIS-S Apr 4 NGC3393 ACIS-S Radiation Belts Apr 5 M84 ACIS-S LEDA138501 ACIS-S Abell2146 ACIS-I Apr 6 M84 ACIS-S 2MASXJ02141794+51445 ACIS-S Apr 7 Abell2146 ACIS-I Radiation Belts Apr 8 A1795 ACIS-I
------------------------------------------
All spacecraft subsystems continued to support nominal operations.
Return to Status Reports