CXC Home | Search | Help | Image Use Policy | Latest Images | Privacy | Accessibility | Glossary | Q&A
Friday 15 March 2019 9.00am EST
During the last week Chandra completed the observing schedule as planned. A real-time procedure was executed on Mar 9 to perform a routine self-check of the Electrical Interface Assembly (EIA) Sequencer. Additional real-time procedures were executed on Mar 9, Mar 12, and Mar 14 to perform full-frame dark current readouts of the Aspect Camera Assembly CCD. Of note this week, the Chandra Cycle 21 proposal deadline was Mar 14 at 6pm EDT. The schedule of targets for next week is shown below and includes an observation of TWHya coordinated with HST. |
------------------------------------------
Radiation Belts E0102-72 ACIS-S E0102-72 ACIS-S Mar 18 CIZAJ2242.8+5301 ACIS-I M84 ACIS-S Mrk1488 ACIS-S Mar 19 SNR1987A HRC-S /LETG eMACSJ1144.2+2836 ACIS-I Radiation Belts Mar 20 Abell1763 ACIS-I TWHya HRC-I /HETG GW170817 ACIS-S Mar 21 TWHya HRC-I /HETG GW170817 ACIS-S Mar 22 Radiation Belts Mar 23 M84 ACIS-S SNR1987A HRC-S /LETG GW170817 ACIS-S SNR1987A HRC-S /LETG Mar 24
------------------------------------------
All spacecraft subsystems continued to support nominal operations.
Return to Status Reports