Friday 22 February 2019 9.00am EST
During the last week Chandra completed the observing schedule as planned. Of note this week, the Avionics and Software Validation Test set (ASVT) is now fully functional at the Wayside facility and has been approved for use in operational activities. The schedule of targets for the next week is shown below and includes an observation of Swift J1728.9-3613, which is a follow-up to a Target of Opportunity accepted on Feb 6, and an observation of SXP 4.78 which was accepted as a Director's Discretionary Time Target of Opportunity on Jan 30. |
------------------------------------------
Radiation Belts Feb 24 Abell1763 ACIS-I HCG57 ACIS-S 3CR322.0 ACIS-S Feb 25 MKW4-N ACIS-I Abell4067 ACIS-I SDSSJ0946-0026 ACIS-S M84 ACIS-S SwiftJ1728.9-3613 ACIS-S/HETG Feb 26 Radiation Belts Feb 27 Abell4067 ACIS-I PSRJ1901-1740 ACIS-S M84 ACIS-S PSRJ1744-1610 ACIS-S Feb 28 Abell4067 ACIS-I SXP4.78 ACIS-S IC0588_s3 ACIS-S Mar 1 IC0588_s1 ACIS-S Radiation Belts Abell2146 ACIS-I M84 ACIS-S Mar 2 Abell2146 ACIS-I M84 ACIS-S Abell4067 ACIS-I Mar 3 Abell1763 ACIS-I PMN_J0948p0022_s3 ACIS-S Radiation Belts
------------------------------------------
All spacecraft subsystems continued to support nominal operations.
Return to Status Reports