News by Date
News by Category
Solar System
Stars
White Dwarfs
Supernovas
Neutron Stars
Black Holes
Milky Way Galaxy
Normal Galaxies
Quasars
Galaxy Clusters
Cosmology/Deep Field
Miscellaneous
Press Resources
Status Reports
Press Advisories
Image Releases
Release Guidelines
Image Use Policy
NASA TV
Biographies/Interviews
Web Shortcuts
Chandra Blog
RSS Feed
Chronicle
Email Newsletter
News & Noteworthy
Image Use Policy
Questions & Answers
Glossary of Terms
Download Guide
Get Adobe Reader
Chandra @ NASA
Visit the Chandra pages at the NASA portal (opens in new window)
Image Use
Image Use Policy & Request Form
Guidelines for utilizing images, applets, movies, and animations featured in this Web Site.
Getting Hard Copies of Images
Ways to obtain photos, slides, etc of Chandra images.
Operations CXO Status Report

Friday 5 April 2019 9.00am EDT

During the last week Chandra completed the observing schedule as planned.

A real-time procedure was executed on Apr 3 to perform a routine self-check of the Electrical Interface Assembly (EIA) Sequencer. Additional real-time procedures were executed on Apr 3 and Apr 5 to perform full-frame dark current readouts of the Aspect Camera Assembly CCD. Real-time procedures were also executed on Mar 31 and Apr 3 to dump one segment of OBC-A memory to test commanding from the Wayside Operation Control Center.

A Chandra press release was issued on Apr 4 announcing the selection of the 2019 Einstein Fellows, who will conduct research related to physics of how the universe works. For details see: http://chandra.si.edu/press/19_releases/press_040419fellowships.html

The schedule of targets for the next week is shown below and includes an observation of GRB190114C, which was accepted as a Target of Opportunity on Jan 29.



------------------------------------------
       ArLac (21 obs)         HRC-I        Apr  8
        A1795                  ACIS-I
        NGC3393                ACIS-S
        GRB190114C             ACIS-S       Apr  9
        J101629.88+073404.9    ACIS-I
        M84                    ACIS-S
        Radiation Belts                     Apr 10
        PSRJ2030+4415          ACIS-S
        M84                    ACIS-S       Apr 11
        PSRJ2030+4415          ACIS-S
        M84                    ACIS-S       Apr 12
        Radiation Belts                     Apr 13
        M84                    ACIS-S
        PSRJ2030+4415          ACIS-S
        M84                    ACIS-S       Apr 14
        PSRJ2030+4415          ACIS-S       Apr 15
        Radiation Belts

------------------------------------------

All spacecraft subsystems continued to support nominal operations.

Return to Status Reports