News by Date
News by Category
Solar System
Stars
White Dwarfs
Supernovas
Neutron Stars
Black Holes
Milky Way Galaxy
Normal Galaxies
Quasars
Galaxy Clusters
Cosmology/Deep Field
Miscellaneous
Press Resources
Status Reports
Press Advisories
Image Releases
Release Guidelines
Image Use Policy
NASA TV
Biographies/Interviews
Web Shortcuts
Chandra Blog
RSS Feed
Chronicle
Email Newsletter
News & Noteworthy
Image Use Policy
Questions & Answers
Glossary of Terms
Download Guide
Get Adobe Reader
Chandra @ NASA
Visit the Chandra pages at the NASA portal (opens in new window)
Image Use
Image Use Policy & Request Form
Guidelines for utilizing images, applets, movies, and animations featured in this Web Site.
Getting Hard Copies of Images
Ways to obtain photos, slides, etc of Chandra images.
Operations CXO Status Report

Friday 9 March 2018 9.00am EST

During the last week Chandra completed the observing schedule as planned.

A real-time procedure was executed on Mar 7 to perform a routine self-check of the Electrical Interface Assembly (EIA) Sequencer.

The schedule of targets for the next week is shown below and includes an observation of SN 2018gk which was accepted as a Target of Opportunity on Feb 13.



------------------------------------------
Radiation Belts E0102-72 ACIS-S E0102-72 ACIS-I NGC3585 ACIS-S Mar 13 SN1987A ACIS-S/HETG NGC3585 ACIS-S Mar 14 SDSSJ131121.32+2227 ACIS-S SN2018gk ACIS-S Radiation Belts Mar 15 SN1987A ACIS-S/HETG NGC3585 ACIS-S Mrk59 ACIS-S PSRJ1605-5257 ACIS-S Mar 16 PSRJ2032+4127 ACIS-S Mrk59 ACIS-S Radiation Belts Mar 17 DDO68 ACIS-S NGC3393 ACIS-S Mar 18 SN1987A ACIS-S/HETG

------------------------------------------

All spacecraft subsystems continued to support nominal operations.

Return to Status Reports