News by Date
News by Category
Solar System
Stars
White Dwarfs
Supernovas
Neutron Stars
Black Holes
Milky Way Galaxy
Normal Galaxies
Quasars
Galaxy Clusters
Cosmology/Deep Field
Miscellaneous
Press Resources
Status Reports
Press Advisories
Image Releases
Release Guidelines
Image Use Policy
NASA TV
Biographies/Interviews
Web Shortcuts
Chandra Blog
RSS Feed
Chronicle
Email Newsletter
News & Noteworthy
Image Use Policy
Questions & Answers
Glossary of Terms
Download Guide
Get Adobe Reader
Chandra @ NASA
Visit the Chandra pages at the NASA portal (opens in new window)
Image Use
Image Use Policy & Request Form
Guidelines for utilizing images, applets, movies, and animations featured in this Web Site.
Getting Hard Copies of Images
Ways to obtain photos, slides, etc of Chandra images.
Operations CXO Status Report

Friday 2 February 2018 9.00am EST

During the last week Chandra completed the observing schedule as planned.

A real-time procedure was executed on Jan 31 to perform a full-frame dark current readout of the Aspect Camera Assembly CCD during a standard one-hour comm pass. This was a demonstration of a new operational concept to obtain dark current data more frequently than the current cadence of four times per year. A second real-time procedure was executed on Jan 31 to swap the prime solid-state recorder (SSR) from the B-side to the A-side. This swap concludes a six-month interval of health and trending data collection on SSR-B.

The schedule of targets for the next week is shown below and includes an observation of Swift J164449.3+573451 coordinated with the VLA, and observations of NGC 300 ULX-1, which was accepted as a Director's Discretionary Time Target of Opportunity on Jan 26.



------------------------------------------
        SDSSJ105310.82+5016    ACIS-S       Feb  5
        PG1116+215             HRC-S /LETG
        SwiftJ164449.3+5734    ACIS-S
        Radiation Belts                     Feb  6
        NuSTARJ151253-8124.3   ACIS-S
        J1254+2104             ACIS-S
        PG1116+215             HRC-S /LETG
        SwiftJ164449.3+5734    ACIS-S       Feb  7
        PG1116+215             HRC-S /LETG
        SDSSJ140025.40+3149    ACIS-S
        E0102-72               ACIS-S
        NGC300ULX-1            ACIS-S       Feb  8
        PSRJ1809-1917          ACIS-I
        Radiation Belts
        NGC2243                ACIS-S       Feb  9
        NVSSJ162830+115403     ACIS-S
        PG1116+215             HRC-S /LETG
        PSRJ1809-1917          ACIS-I
        PG1116+215             HRC-S /LETG  Feb 10
        PSRJ1809-1917          ACIS-I
        PG1116+215             HRC-S /LETG
        SDSSJ154824.01+3335    ACIS-S       Feb 11
        Radiation Belts
        NGC300ULX-1            ACIS-S
        NGC2243                ACIS-S
        SwiftJ164449.3+5734    ACIS-S
        PSRJ1809-1917          ACIS-I       Feb 12
        PG1116+215             HRC-S /LETG

------------------------------------------

All spacecraft subsystems continued to support nominal operations.

Return to Status Reports